PROJECTS (in the last 10 years)
- Sınav College Şahin Campus Kartepe/KOCAELİ
Employer: 4A1B EĞİTİM HİZMETLERİ
Year: 2018-2019
Project: Construction of 22.000,00 m2 indoor with the capacity of 1800 students
Project Cost: 30.000.000,00 TL
- Steel Constriction Depot Construction Vezirçiftliği/KOCAELİ
Employer: Esin CEVİROĞLU
Year: 2018-2019
Project: Construction of 2500 m2 (H=12 MT) steel depot
Project Cost: 2.250,000,00 TL
- Poultry Farm with the capacity of 100.000,00 Kandıra/KOCAELİ
Employer: ÖZEL ONURŞAHİN LTD.ŞTİ
Project: 6800 m2 two-storey reinforced concrete and steel construction, 1500 m2 reinforced concrete platen wall
Project Cost: 2.800.000,00 TL
- MARSHAL PAINT AND VARNISH CO. Dilovası/KOCAELİ
Employer:Marshal Paint and Varnish Co.
Year: 2015
Project: Construction of security room and reception room buildings; and parking area
Project Cost: 825.000,00 TL
- DİBEKTAŞI ALNOUR VILLAS Sapanca/ADAPAZARI
Employer: AYKON ELEKTİRİK
Year: 2015
Project: Rough construiction of six villas and 1350 m2 reinforced concrete platen Wall
Project Cost: 1.050.000,00 TL
- POULTRY FARM WITH THE CAPACITY OF 150.00,00 Kandıra/KOCAELİ
Employer: ÖZEL ONURŞAHİN LTD.ŞTİ
Year: 2013-2014
Project: 11.000 m2 two-strorey reinforced concrete and steel construction; 1800 m2 platen wall
Project Cost: 4.500.000,00 TL
- WATER DEPOTS CONSTRUCTION ( 9 of 1500 m3, 1 of 2500 m3, and 1 of 10000 m3) SUBCONTRACTOR Tobruk/LIBYA
Employer: Libya Water and Sewerage Administration
Prime Contractor:Tobruk/LIBYA
Year: 2008-2011
Project Cost: 9.380.000,00 LD (7.500.000,00 $)
Subcontractor: 3.000.000,00 $
- TREATMENT FACILITY RESTORATION SUBCONTRACTOR Tobruk/LIBYA
Employer: Libya Water and Sewerage Administration
Year: 2006-2007
Prime Contractor: BELKHATR C o Tobruk/LİBYA.
Procet Cost: 4.556.000,00 LD ( 3.645.000,00 $ )
Subcontractor: 2.250.000,00 $
- ÖZGÜN VADİ HOUSING ESTATES İzmit/KOCAELİ
Employer: Özgün vadi Coop. Administration
Year: 2004-2007
Project: construction of 44 triplex villas
Project Cost: 6.600.000,00 TL